The 23rd, when the job was scheduled we had monsoon type rains and high winds. The crew arrived on time at 8;30am and put plastic down on our floors as they entered. Throughout the morning they were very considerate of not making much of a mess even in the work area. "Murphy's Law" caused the power to go out at 12:10pm. The work crew ate their lunch and then by flashlight continued working and cutting PVC pipes by hand. At 12:40pm the power came back on and the job wrapped up around 4:30pm. The crew took every piece they jack hammered or cut with them and even backed out the door rolling plastic up behind them. My wife was very pleased with the clean up and that makes me pleased. Needless to say it was a perfect day for testing a new basement water proofing job. The system works perfectly and we are drier than we ever have been.
I would not hesitate to recommend you to whomever has a need for your service. My neighbors have already seen your system and may be calling you soon.
George D. of Monroe, NY
Tuesday, December 28th